SmartBolts® DTI™ on wind turbines
Did you know there are 1500 bolts in the average wind turbine?
Operators of wind farms such as the NAES White Creek Wind Project must perform periodic maintenance inside the turbines. Torque checking electrical connection bolts is one dangerous job that requires workers to don bomb-proof suits, shut down power, and go inside an electrical enclosure. Using our products, workers can visually verify bus bolts remain tight by safely inspecting them through a plexiglass viewing window.
SmartBolts® DTI™ in wind turbines help to reduce overall maintenance costs and improve operational safety.
To send a detail and summary UP-TO-DATE presentation please contact us on info@aymara.cz (Czech, English and Polish version).